Interchange at Bricherhof as part of a large-scale construction project.

This large-scale project is located on the Boulevard J.F. Kennedy in Luxembourg-Kirchberg near Bricherhof. The many existing roads remained partially in service throughout the construction period.

This large-scale project is located on the Boulevard J.F. Kennedy in Luxembourg-Kirchberg near Bricherhof. It is located among many existing roads that remained partially in service throughout the construction period.

Multi-phase execution was necessary for the following work:

  • removal and reconstruction of the sewage system;
  • construction of two roundabouts;
  • demolition of three existing structures;
  • construction of temporary pavements along Boulevard Kennedy;
  • construction in stages of an underpass below Boulevard Kennedy (structure on piles);
  • construction of the new Boulevard Kennedy (in stages);
  • installation of new networks throughout the area;
  • phased connection of adjacent streets;
  • large walls along new roads, either in gabions or concrete walls faced with natural stone.

± 100,000m3

Backfill of excavated soil

± 41,000m3

Excavated soil

± 50,000m3

Trenches

Key Figures

Backfill

180,000m²


Waste water drains

4,000rm

Drain pipes

10,000rm

Visible faces in natural stone

2,500m2

Formwork

± 6,700m2

Reinforcement

± 300,000kg

Concrete

± 2,300m3

Installation of borders

± 8,245m

Slag gravel

± 11,000t

Asphalt

± 10,400t