Gasperich Bridge O.A. 216
Category
Installation of a bow string bridge over the A6 motorway
Installation of a 90m bow string bridge over the A6 motorway in only 48 hours. This structure allows the RN4 to cross the A6 motorway.
The main challenge of this project was to construct a bow string bridge over the E25/A6 motorway in only 48 hours, i.e. one weekend.
To achieve this, the entire prestressed concrete deck, including the metal frame for the arches, was assembled elsewhere and transported to the motorway using machines and supports specifically prepared in advance for this project.
The works included the construction of a roundabout at the intersection of the RN4 and the CR186, a cycle path and the diversion of certain networks.
1,800t
Weight of the apron to be moved
50m
Long bow-string apron, resting on two abutments
18.30m
Total width of the bridge
1,700m3
B35 concrete
317t
Steel
48h
Installation
Projets similaires
Redesign of the Pontpierre interchange
2023
Redevelopment of the Pontpierre interchange on the A4 to improve traffic flow and safety for local residents.
Dippach-Gare bypass
2023
Construction of a 2.2 km bypass to relieve traffic congestion on the rue des Trois Cantons.
Hosingen cut-and-cover tunnel
2023
The cut-and-cover tunnel is the first section of the Hosingen bypass.
Glaasbuurgronn and Groussheck viaducts
1998
As part of the construction of the Route du Nord, Félix Giorgetti carried out numerous works including the construction of two viaducts, Glaasbuurgronn and Groussheck.